Guaranteed Termite Barrier- Treatment at every stage
- As per IS 6313 (Part 2)
- Guaranteed work
New Houses, Apartments & Commercial Buildings
Pre-Construction Anti-Termite Treatment
The cheapest time to protect a building from termites is before it is built. We treat the soil at each construction stage, foundation, plinth and floor, so the finished building sits on a continuous chemical barrier against subterranean termites.
Stage-by-stage soil treatment
Anti-Termite Treatment for New Buildings
Subterranean termites travel up from the soil through the smallest gaps in a slab or wall. Once a building is finished, they can only be stopped by drilling into floors and walls. Treating the soil while the building goes up places the barrier exactly where termites enter.
We follow the stages laid down in IS 6313 (Part 2), the Indian Standard for pre-constructional anti-termite treatment:
- Foundation trenches: The bottom and sides of foundation trenches and pits are treated before the footing concrete is laid.
- Plinth and back-fill: The soil filled around the foundation and inside the plinth is treated layer by layer as it is filled.
- Before the floor slab: The levelled earth under the ground floor is treated just before the floor is laid, along with the soil around pipes and conduits that pass through it.
Timed with your builder
Each stage must be done at the right moment in construction. We agree the visit dates with you or your site engineer, and we give you a written record of each stage treated.
- Foundation trench and pit treatment
- Plinth and back-fill soil treatment
- Under-floor soil treatment before the slab
- Pipe and conduit entry points
- Visits timed with your construction schedule
- Written record and guaranteed work
Service Scope & Pricing
| Independent house (per plot) | Quote on plot size |
| Villa / row house project | Quote on plan |
| Apartment building | Quote on plan |
| Commercial / industrial building | Site visit |
| Post-construction perimeter | Quote on inspection |
* Pre-construction treatment is priced on the built-up area and the number of stages. Send the plot size and plan on WhatsApp for a quote.
Guaranteed work
Every pre-construction termite job comes with a written warranty. If the problem comes back within the warranty period, we revisit and re-treat free of charge. The period is written on your job card before we start.
Get a Quote on WhatsAppFrequently Asked Questions
Pre-Construction Termite FAQs
Answers to common questions before you book.
When should pre-construction treatment start?
At the foundation stage, before the footing concrete is laid. If foundations are already done, the plinth and under-floor stages can still be treated, and we will tell you what can be covered.
Which standard do you follow?
We follow the stages set out in IS 6313 (Part 2), the Indian Standard for pre-constructional chemical treatment against subterranean termites.
Will you coordinate with my contractor?
Yes. Share your site engineer's number and we agree each visit date with them, so no stage is missed.
Is there a warranty?
Yes. The work is guaranteed, and the warranty period is written on the certificate you receive when the treatment is complete.
Guaranteed Work, Pay After the Job
Book Pre-Construction Termite in Hyderabad
Send a photo or your area on WhatsApp. We cover Hafeezpet, Kondapur, Madhapur, Gachibowli, Kukatpally, Miyapur and all of Hyderabad.